Inventering av processvattenbalans : fastställande av fjärrvärmedistributionens läckage inom Vattenfall Värme Uppsala AB
Heat is distributed to the district heating customers through pipes with water as a heat carrier. The district heating system is complex. To decide what is leakages from the district heating net versus what is the water consumption of the plant, is difficult.
Therefore, the purpose of this master thesis is to establish a model where the district heating net?s leakages but also the water consumption of the plant can be followed
daily. The project is performed at Vattenfall´s district heating power plant in Uppsala.
Information is gathered through discussions, drawings of the plant and guided tours of the plant.
Projektering av småhus med solvärme som huvudkälla
In this report a study has been done regarding different heating systems on which are the mostcomprehensive with solar heating systems. The report has also been focusing if solar power can beused as a primary heating source for supplying more than 50 % of the buildings total heatingproduction. The University of Dalarna constructed a demo-house for this purpose and according tocalculations the total solar usage is more than 50 %. This house has been made for referenceregarding the design of the heating system of property 5:37.Further studies have been made to compare different heating systems that are compatible with asolar system, where the compared systems purpose is to be independent of direct using electricity. Asystem of this design is regarded as sustainable according to environmental as economic issues.
Analys av energiförbrukning, Akzo Nobel Functional Chemicals AB
The main purpose of this project was to make a survey of the steam and electricity consumption at Akzo Nobel Functional Chemistry AB and give suggestions of how to minimize them. These three different areas were focused on. First to make a survey of all the most important consumers, second to find the electricity consumption of the air compressors and the amount of waste heat produced from them. The third area was to calculate a model of how much fresh water that is used during a cooling sequence in the water based heating/cooling system of the reactors and give a suggestion of a suitable reuse for this water.The main result is a total survey of the energy consumption in steam and electricity. The survey shows that the second largest group after drying is heating of ventilation which gives big potentials of reducing the total steam consumption if there is a way of being self supporting in ventilation heat.
Hållbara uppvärmningsalternativ för hotellstugorna på Grinda : En kvantitativ studie gällande hållbara uppvärmningsalternativ på en skärgårdsö
Skärgårdsstiftelsen, which is responsible for several of the archipelago islands in Stockholm, has chosen to explore the possibilities for more sustainable heating systems in buildings on the islands in collaboration with KTH. A reduction of energy use and improving the efficiency of existing heating systems are included as part of the environmental work. This report studies the island of Grinda, which is located outside the area of Vaxholm in Stockholm. The study area consists of a guesthouse consisting of a restaurant as well as conference facilities and four neighboring cottages used for overnighting. The cottages now run solely on direct electricity, both for heating and hot water.
Värmeåtervinning ur spillvatten : En utredning av möjligheterna med spillvattenvärmeväxlare
The purpose of this report is to investigate the possibilities with drain water heat recovery (DWHR) in residential buildings. Information and relevant theory has been collected and summarized in this report. Calculations have been done for given scenarios to evaluate profits. DWHR heat exchangers use simple technology and have long life-time. The heat exchanger is connected to outgoing drainage pipe and incoming cold-water supply so countercurrent flow is accomplished.
Geotermisk fjärrvärme i Gunsta
Gunsta is situated about 10 km east of Uppsala. Today there are plans to establish 1000 new households in Gunsta before year 2030. The required energy for heating houses and water would be distributed via a district heating system, which also includes 200 existing residences. The annual required energy, according to this study, would be 16.2 GWh with a maximal peak effect of 6.9 MW.
To meet this need, the study suggests a system with heat pumps to upgrade the 31?C water from a 1.8 kilometre deep borehole.
Energieffektivisering i ett verkstadsföretag : En analys av energibesparande åtgärder samt uppvärmnings- och kylsystems driftkostnader och koldioxidutsläpp
The energy use in a workshop company has been examined in this work in order to find areas for energy efficiency improvement. The combined oil and electricity heating in the company were compared with other alternative heating systems including cooling of the premises in following combinations:Ground source heat pump for heating and coolingDistrict heating and absorption coolingDistrict heating and low temperate surface water coolingEnergy use, operation costs and carbon dioxide emissions were calculated for the current heating systems and the three alternatives including cooling. The ground source heat pump for heating and cooling decreases bought energy with 34 MWh annually compared to current heating only. The district heating and low temperate surface water cooling has the largest reduction of operation cost and carbon dioxide. The operation cost decreases with 42 kSEK and the carbon dioxide with 43 metric ton CO2 annually.
Spillvärmeåtervinning
SAPA´s resource of waste heat is the basis for this thesis to investigate the possibility of energy assets in their cooling water and possible uses for it. The energy in the waste water is greater than the current need which has three uses which are (1) heating the factory, (2) converting liquid propane to propane gas and (3) local domestic heating. The average energy load that is available is 1, 7 MW and the average temperature in the cooling water is 41°C. The total energy load at dimensioning out side temperature is approximately 1,6 MW for the three current uses. The temperature is currently too low to be used directly in the existing systems so an upgrade is needed.
Samkörning mellan värmepumpar och fjärrvärme : Bostadsrättsföreningen Bogården
This diploma work covers an investigation over the heat - and hot water systems of thetenant-owner's association, Bogården. The heat - and hot water needs of Bogården aresatisfied by both district heating as well as three heat pumps. Implemented investigationshows that the heat pumps are not used in a profitable way. Apart from that, the reservepossibilities are small. There is also a risk of the growth of Legionella bacterium in thehot water system.Since the heat pumps are already installed, HSB-Gävleborg (responsible for Bogården)has a wish to investigate possible proposed actions for optimization of existing plant.After completed investigation, a new proposed action is presented.
Utvärdering av vattenrening och identifiering avförluster m a p energi vid Bravikens pappersmaskin 53
This Master degree project has been performed at the Braviken paper mill on papermachine 53 (PM53) which produces newsprint paper. The current economic situationhas contributed to declining demand for newsprint, which means it is extra important tobe competitive by high energy efficiency. Particularly as energy prices are expected torise when the economic growth returns.One way to increase energy efficiency is by reducing the water use in paper and pulpmills and consequently save energy through reduced heating of water. The thesis's maintask is to evaluate whether a water purification plant (microflotation plant) forpurification of process water in PM 53 is profitable. The microflotation plant enablesreuse of warm process water instead of losing the energy to receiving waters.
Underlag för BREEAM-certifiering : Kristianstad Nya Galleria
The company Olofsfors AB manufactures drive belts for forest machinery, known as ECO-Tracks, and abrasion-resistant steel and cutting edges for graders, excavators and tractors, known as Bruxite and SharqEdges. Manufacturing these products requires the steel to be heated and molded, then submerged in water and hardened. The water used in the hardening of steel is pumped to the process from pits below the floor and then pumped back to the pit after it?s been used. Since the temperature of this water rises after being used to harden the steel the temperature of the pumping pit needs to be adjusted to maintain its setpoint of 21°C.
Utvärdering av ett värmepumpsystems prestanda till en HWC-tvättmaskin : Med fokus på fläktvarvtal och köldmedieflöde
This report was performed in order to evaluate a new technological measure and focuses generally on a heat pump system to a HWC-washing machine. The client is Asko Appliances AB, a company well known for its environmentally friendly products. The goal of this study was to improve the energy efficiency of a washing machine by combining a heat pump device to the heater of the wash water, in order to reduce the energy consumed for heating the water. Besides reducing the energy consumption in heating the water, the washing machine was required to meet low noise and short operating time specifications. For that purpose, nine trials in three test series have been carried out.
Driftoptimering av torkmaskin : Driftoptimering av torkmaskin 3 vid Billerudkorsnäs Karlsborg AB
The company Olofsfors AB manufactures drive belts for forest machinery, known as ECO-Tracks, and abrasion-resistant steel and cutting edges for graders, excavators and tractors, known as Bruxite and SharqEdges. Manufacturing these products requires the steel to be heated and molded, then submerged in water and hardened. The water used in the hardening of steel is pumped to the process from pits below the floor and then pumped back to the pit after it?s been used. Since the temperature of this water rises after being used to harden the steel the temperature of the pumping pit needs to be adjusted to maintain its setpoint of 21°C.
Fjärrstyrd undervattensfarkost
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Optimering av B-stolpe
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.